GM2000 foam concrete machine is composed of 2000l mixer, foam generator, motor, equipped with screw feeding conveyor, belt conveyor and add lubricating oil. The equipment is also equipped with a weighing sensor and a electronic control system, which can operate more easily.
Main Features
1. Control system: concentrated control, easy to operate.
2. Mixer tank: bigger capacity 2000L, each batch can produce large quantity foam concrete, more efficiency.
3. Forecd mixing: foam concrete mixing more uniform and even.
4. Storage tank: used to link mixer and pump, make the working process continuously.
5. Lubrication system: make the machine low failure rate.
6. Guard fence: good safety for workers.
7. Moving system: with wheels, can be moved anywhere easily.
Technical Parameter
_1753865434833.png.webp)
Product Display
_1753865472157.jpg.webp)
_1753865479182.jpg.webp)
Application
Foam concrete machine applications: 1. External wall thermal insulation 2. Thermal insulation roofing 3. Thermal flooring 4. Upstandingbeam foundation ditches filling 5. Sound insulation and fire protection walls 6. Playground and track construction 7. Sound insulation layer, tunnel lining filling 8. Cellar, basement and arch filling 9. Sewers and Drains filling 10. Horizontal floor heightening 11. Water tank and fuel tank building 12. Platform filling and mending 13. Garden and rockeries 14. Foam concrete block 15. Foamed concrete precasting, hollow wallboard casting
_1753697750832.jpg.webp)
_1753697815135.png.webp)
FAQ
1. Are you the manufacturer or a trade company?
We are the manufacturer for producing grout equipment.
And we have owned a trading company to do International Business,
So that:
1)-We can supply good service with professional international trade experience.
2)-The price is much more competitive.
2. Can you do the ODM or OEM? What is MOQ?
Yes, it is possible as discussed, MOQ: 1unit.
3. What about delivery time? How long can I get the machine after the order?
The production time is as fast as 30-60 working days if you customize the machine.
The standard machine in stock can be delivered as soon as possible after ordering.
4. How to pay for yourself?
50% down payment, then production starts, and the balance 50% paid before shipping.
If the machines are in stock, pay 100% then delivery.
Our Advantages

