






|
Description |
Unit |
Parameter value |
|||
|
Outline dimension |
mm |
10190×2500×3700 |
|||
|
Overall weight |
kg |
20000 |
|||
|
Chassis |
Model |
ZZ5207M521GC1 |
|||
|
Manufacturer |
China Sinotruk Group Co., Ltd. |
||||
|
Max. speed |
km/h |
90 |
|||
|
Max. grade-ability |
% |
35 |
|||
|
Wheelbase |
mm |
5200 |
|||
|
Tire |
11.00R20 |
||||
|
Engine |
Model |
MC07.28-30 |
|||
|
Max. power |
kW |
203 |
|||
|
Max. torque |
N·m/(r/min) |
1100/1200-1800 |
|||
|
Displacement |
L |
6.87 |
|||
|
Emission standard |
Eruo III |
||||
|
Pumping system |
Theoretical output |
m³/h |
100 |
||
|
Concrete pumping pressure |
MPa |
8 |
|||
|
Theoretical pumping times |
Time/min |
25 |
|||
|
Delivery cylinder diameter ×stroke |
mm |
φ230×1600 |
|||
|
Max. diameter of pumping concrete |
mm |
40 |
|||
|
Filling height |
mm |
1550 |
|||
|
Concrete slump range |
cm |
8~23 |
|||
|
Placing boom |
Reach height |
m |
29.6 |
||
|
Reach depth |
m |
18 |
|||
|
Slewingradius |
m |
25.7 |
|||
|
Slewing angle |
° |
±270 |
|||
|
Unfolding angle of the 1st section |
° |
90 |
|||
|
Unfolding angle of the 2nd section |
° |
180 |
|||
|
Unfolding angle of the 3rd section |
° |
250 |
|||
|
Unfolding angle of the 4th section |
° |
235 |
|||
|
Unfolding angle of the 5th section |
° |
||||
|
Stabilizer span |
Longitudinal span of stabilizer |
mm |
6100 |
||
|
Transverse span of front stabilizer |
mm |
5555 |
|||
|
Transverse span of rear stabilizer |
mm |
4810 |
|||
|
Others |
Transfer tube |
Rock valve |
|||
|
Lubrication method |
Automatic lubrication |
||||
|
Control method |
Manual/remote control |
||||
|
Volume of water box |
L |
400 |
|||
|
|||||


|
Add Attachments