Started in December 2015 and was built by Henan Siyuan. Since the start of the company\'s timely supply, April 12, 2016 successfully passed the hydrostatic test. On December 24, 2016, the relevant personnel of the pot inspection office arrived at the scene to conduct the inspection and acceptance work. The acceptance report was passed on December 27.